[1] 赵玉霞,谭胜初.钢结构半刚性节点概述[J].四川建筑,2008,28(4):87-88.
[2] 彭登峰,刘坚.双腹板顶底角钢半刚性节点的滞回性能研究[J].钢结构,2012,27(2):15-19.
[3] 王新武.带双腹板顶底角钢连接初始刚度研究[J].世界地震工程,2005,21(4):123-125.
[4] 王燕,李华军,厉见芬.半刚性梁柱节点连接的初始刚度和结构内力分析[J].工程力学,2003,20(6):65-69.
[5] 李国强,王静峰,刘清平.竖向荷载下足尺半刚性连接组合框架试验研究[J].土木工程学报,2006,39(7):43-52.
[6] 陈军,郝际平.腹板双角钢连接框架-钢板剪力墙体结构滞回性能有限元分析[J].钢结构,2012,27(10):6-12.
[7] YANG J G ,JEON S S.Analytical Models for the Initial Stiffness and Plastic Moment Capacity of an Unstiffened Top and Seat Angle Connection Under a Shear Load[J].International Journal of Steel structures,2009,9:195-205.
[8] KOMURO M,KISHIN,CHEN W F.Elasto-Plastic FE Analysis on Moment-Rotation Relations of Top-and Seat-Angle Connections[C]∥5th International Workshop on Connections in Steel Structures:Behaviour,Strength and Design,2004:111-120.
[9] AZIZINAMINI A.Monotonic Response of Semi-Rigid Steel Beam to Column Connections.M.S.thesis[M].Columbia:University of South Carolina,1982. |